ENGINEERED STEEL · NATIONWIDE DELIVERY
T-08 / GARAGES

Steel garages from two-car to fleet

Detached steel garages with overhead doors, walk doors, windows, and trim colors that match the house. Slab and apron coordination included in turnkey scopes.

Typical configuration

24×30
24′ WIDTH12′ EAVE

PRELIMINARY ESTIMATE. SUBJECT TO SITE VERIFICATION, ENGINEERING REVIEW, LOCAL BUILDING-CODE REQUIREMENTS, FINAL MATERIAL PRICING, AND FOUNDATION REVIEW.

Preliminary pricing

3 SCOPES
Building kit only$33,600 – $39,400
MATERIALS DELIVERED TO YOUR SITE · ≈ $50.18/SQ FT
Kit + erection$46,800 – $54,900
DELIVERED AND ERECTED BY AN INSURED CREW · ≈ $69.96/SQ FT
Turnkey$58,600 – $68,700
SLAB, ERECTION, AND INTERIOR BUILDOUT · ≈ $87.57/SQ FT

What's included

STANDARD
Matched residential trim
Insulated overhead doors
Attic-truss look options
Gutter packages

Common uses

APPLICATIONS
  • Vehicles
  • Boats
  • Toys
  • Fleet

Where we build

ALL 50 STATES

Delivery and erection in every state, engineered to local loads. Featured markets — or browse all state and city pages:

Questions we get

FAQ
How much does a steel building cost?

Most building kits land between $17 and $30 per square foot before foundation and erection. A delivered-and-erected 40×60 typically runs $88,000–$118,000 in most US markets; coastal and heavy-snow regions trend higher, and turnkey with slab and buildout runs higher still. Your final number depends on eave height, snow and wind loads, door openings, and finish level.

Do you handle engineering and permits?

We do not perform engineering or pull permits directly. We act as your co-pilot through sourcing and purchasing the metal building: we help you find a licensed engineer in your state, work with your engineer, answer permit questions, and provide free permit checklist and cover-letter templates you can download. The permit itself is pulled by the owner or GC of record.

How long does it take to get a building?

Preliminary concept and estimate: 1–3 business days. Sealed drawings after order: 3–5 weeks. Fabrication and delivery: 6–12 weeks depending on mill schedules. Erection of a typical 40×60 takes 2–3 weeks once the slab has cured.

Can I buy just the kit and erect it myself?

Absolutely. Kits ship bolt-together with a marked erection manual and piece list. Many contractors and experienced owners self-erect. We can also supply an insured crew for all or part of the work.