ENGINEERED STEEL · NATIONWIDE DELIVERY
19 / DESIGN YOUR BUILDING

Build it on screen before you build it on site.

Every change updates the elevation, the material takeoff, and the estimate. Your configuration saves automatically in this browser, so you can come back and keep working.

40 × 60 · GABLE · 16′ EAVE$104,900 – $123,000
40′ WIDTH16′ EAVE
2,400
SQ FT
$47.02
$ / SQ FT
Kit + erection
SCOPE
Steel Buildings
TYPE

PRELIMINARY CONCEPT ONLY. NOT FOR CONSTRUCTION. FINAL DIMENSIONS, STRUCTURAL DESIGN, CODE COMPLIANCE, LOADS, FOUNDATIONS, AND CONNECTION DETAILS MUST BE REVIEWED AND APPROVED BY QUALIFIED PROFESSIONALS.

BUILDING TYPE
BUILDING SIZE
ROOF STYLE
WALL STYLE
DOORS & WINDOWS
COLORS
ROOF COLORCHARCOAL · C030
WALL COLORBURNISHED SLATE · C012
TRIM COLORGALVALUME · C204
DOOR COLORPOLAR WHITE · C001
WAINSCOT COLORVETTABLE METAL BUILDINGS BLUE · C120
COLORS SHOWN ARE APPROXIMATE. ACTUAL PANEL COLOR MAY VARY FROM SCREEN PREVIEWS — REQUEST PHYSICAL CHIPS BEFORE FINAL SELECTION.
INSULATION
SCOPE OF SUPPLY
OPTIONS & ACCESSORIES

Preliminary estimate

$104,900 – $123,000
BUILDING PACKAGE
  • Structural steel frame & secondary$30,085
  • Roof & wall panels$16,410
  • Trim, closures & fasteners$8,205
OPENINGS
  • Roll-up / overhead doors (1)$3,850
  • Walk doors (1)$1,150
  • Windows (2)$1,440
  • Wainscot panel band$2,040
INSULATION
  • R-13 blanket$4,320
OPTIONS & ACCESSORIES
  • Gutters & downspouts$2,900
ERECTION
  • Erection labor & equipment$18,304
  • Crane & lift equipment$7,760
ENGINEERING & LOGISTICS
  • Sealed drawings & engineering$5,040
  • Permitting support$1,450
  • Freight & delivery$4,520
ALLOWANCES
  • Contingency allowance (5%)$5,374
MIDPOINT TOTAL$112,848

PRELIMINARY ESTIMATE. SUBJECT TO SITE VERIFICATION, ENGINEERING REVIEW, LOCAL BUILDING-CODE REQUIREMENTS, FINAL MATERIAL PRICING, AND FOUNDATION REVIEW.

Concept summary

A 40′ × 60′ steel building with a gable roof at 4/12 pitch and a 16′ eave height, clad in Burnished Slate wall panels with Galvalume trim and a Charcoal roof. Openings: 1 roll-up, 1 walk door, 2 windows.

APPROXIMATE MATERIAL LIST
  • Rigid frames3 frames @ 40' clear span
  • Bay spacing2 bays @ ~30'
  • Roof panels (26ga)~2,592 sq ft
  • Wall panels (26ga)~3,200 sq ft
  • Girts & purlins~2,160 lineal ft (Z-section)
  • Anchor bolts24 @ column bases
  • Trim & closures~480 lineal ft
  • Fasteners~3,360 self-drilling screws
ESTIMATED SCHEDULE
  • Estimating & proposal1–2 wks
  • Order, sealed drawings & permit review3–5 wks
  • Fabrication7–11 wks
  • Foundation & site prep2–4 (concurrent) wks
  • Delivery1 wks
  • Erection & closeout2–4 wks
NEEDS PROFESSIONAL VERIFICATION
  • Ground snow load, design wind speed, exposure category, and seismic design category for the project ZIP.
  • Soil bearing capacity and frost depth for foundation design.
  • Local amendments, setbacks, and permit requirements.
  • Site access for delivery trucks and lift equipment.
ASSUMPTIONS IN THIS ESTIMATE
  • Level, accessible site with no rock excavation or demolition.
  • Standard 26ga panels and a Risk Category II occupancy.
  • Current mill pricing; steel is re-quoted at order.
  • Sales tax, permit fees, and utility connections excluded.
Submit for professional review